DETAILED DESIGN
■ Piping Material Take-Off (MTO)
- Preparation of 1st material take-off sketch and excel data generated from P&ID and plot plan
- Preparation of 2nd material take-off sketch and excel data generated from piping layout
- Preparation of final material take-off based on isometric piping drawings
- Preparation of additional material requisition based on addendum
■ Piping Layout
- Preparation of conceptual design
- Preparation of design under study phase
- Preparation of final or detailed design
- Fabrication of plan drawings and isometric drawings
■ Piping Support
- Selection and design of pipe support from standard
- Preparation of special support drawings including summary of materials
■ Piping Information to all disciplines
- Preparation of general information
- Preparation of civil and structure information
- Preparation of sleeper information
- Calculation of piping loads
■ Stress Analysis
- Selection of critical lines for stress analysis
- Preparation and evaluation of stress calculation drawings
- Preparation of line conditions of stress analyzed lines
■ Steam Tracing
- Preparation of steam tracing assembly
- Arrangement of steam tracing manifold on layout
- Preparation of distribution and collection manifold list
- Layout of distribution and collection manifold headers and piping
■ 3D Modeling
- 3D modeling using PDS, PDMS, SP3D and AP3D
- 3D model review and interface check using Navisworks and SPR
- Fabrication of extracted isometric drawings